Building a Healthier Home Checklist

$7$5.6020% off$7
Loading secure purchase options…
$7$5.60 · Printable PDF · Download after checkout 20% off$7 · Printable PDF · Download after checkout
The phase-by-phase checklist I wish I’d had before we broke ground.
I’m not a builder, and I don’t claim to know everything. I’m a wife, a mama, and a mold survivor who takes moisture and building very seriously. When we built our home, I wanted every decision made with moisture in mind, from the very first shovel of dirt. This checklist is what I would consider during any build: what to ask, what to look at with my own eyes, and what we actually chose for our own home.
Most useful before and during your build
So many moisture issues begin quietly while a house is going up: lumber that gets closed in before it’s dry, a missing piece of flashing, a shower that was never truly waterproofed. The good news is that these things are easiest to address while they’re still a line on a drawing or the walls are still open. That’s exactly when this checklist is meant to be in your hands.
Plan it in, and get it in writing
Read it once before you sign a contract or finalize plans, when changes cost the least. Walk through planning and site choices, foundation and drainage (plus crawlspace basics), and bring my 60 questions to ask your builder so the answers are written down.
Check it with your own eyes, phase by phase
Framing and dry-in with my 16%-or-less moisture rule, roof, windows and exterior, plumbing and water, HVAC, ventilation and humidity, insulation and air sealing, shower and wet-room waterproofing, and a before-drywall walkthrough for your last good look inside the walls.
For the finish line and move-in
A final walkthrough to bring on key day, and a few simple move-in habits to keep things dry.
Inside you’ll find:
Planning, design & your site
Foundation & drainage, plus crawlspace basics
Framing & dry-in, with my 16%-or-less moisture rule
Roof, windows & exterior
Plumbing & water
HVAC, ventilation & humidity
Insulation & air sealing
The before-drywall walkthrough
Shower & wet-room waterproofing
Non-toxic finishes
My never-install list
60 questions to ask your builder
The final walkthrough and move-in habits
A moisture reading log, a slab & humidity log, and notes pages
What we did in our own build
All through the checklist, you’ll find “What we did” notes: the real choices we made in our own mold-conscious build, including the budget calls. A few of them:
- An exposed, sealed concrete slab, with no crawlspace
- Kiln-dried framing lumber, checked at 16% or less before close-in
- Rockwool (stone wool) insulation in every wall
- Triple-flashed windows
- Raised cabinets on legs, up off the floor
- Leak sensors under every water source
- An ERV for balanced fresh air
Take a peek inside


It’s made to be printed, scribbled on, and brought to every builder meeting and site walk.
Pair it with the Selections Tracker
When you’re ready to choose paint, floors, cabinets, and the rest, my Healthy Finishes & Selections Tracker is the room-by-room companion to this checklist, with a place to write down every product you pick. See the Selections Tracker →
Who it’s for
Families who are planning a new build or are in the middle of one, and want to make healthier, moisture-aware choices without needing to become building experts. You don’t have to know everything about building science. You just need to know which questions to ask, and be a kind, persistent advocate for your family.
A 24-page printable PDF, not a physical product. I share what we did in our own build and what I’ve learned along the way. I’m not a builder, engineer, or home inspector, so please walk through your plans with your builder and local pros. Codes, climates, and houses all differ.
PDF delivered after payment is confirmed.